Selection of optimal reheat temperature in heat recovery boiler at combined heat and power plant with GT-topping
| Parent link: | MATEC Web of Conferences Vol. 141 : Smart Grids 2017.— 2017.— [01029, 4 p.] |
|---|---|
| Autor corporatiu: | , |
| Altres autors: | , , , , |
| Sumari: | Title screen Calculations to determine optimum value of steam reheat temperature in relation to the cycle arrangement of steam turbine power plant with gas turbine topping are conducted in this paper. Operation of T250-240 turbine unit in cogeneration mode has been considered during steam reheat displacement from steam boiler to heat recovery boiler. |
| Idioma: | anglès |
| Publicat: |
2017
|
| Matèries: | |
| Accés en línia: | https://doi.org/10.1051/matecconf/201714101029 http://earchive.tpu.ru/handle/11683/46016 |
| Format: | Electrònic Capítol de llibre |
| KOHA link: | https://koha.lib.tpu.ru/cgi-bin/koha/opac-detail.pl?biblionumber=657286 |