Vertical section construction of wells at Kuyumbinsky oil field via percussive-rotary drilling with DTH hammer
Guardat en:
Parent link: | IOP Conference Series: Earth and Environmental Science Vol. 43 : Problems of Geology and Subsurface Development.— 2016.— [012072, 7 p.] |
---|---|
Autor principal: | |
Altres autors: | , |
Sumari: | Title screen The article presents the analysis of sequential use of mobile percussive-rotary drilling sets with DTH hammer and bottom-hole cleaning by foam mud in construction of vertical sections along with at Kuyumbinsky oil field. On the basis of the analysis, an engineering solution is proposed to prevent disastrous mud loss that is the key factor of efficiency in implementation of resource-saving technologies. |
Idioma: | anglès |
Publicat: |
2016
|
Col·lecció: | Latest Technologies in Oil and Gas Driling |
Matèries: | |
Accés en línia: | http://dx.doi.org/10.1088/1755-1315/43/1/012072 http://earchive.tpu.ru/handle/11683/35181 |
Format: | Electrònic Capítol de llibre |
KOHA link: | https://koha.lib.tpu.ru/cgi-bin/koha/opac-detail.pl?biblionumber=650896 |
Etiquetes: |
Afegir etiqueta
Sense etiquetes, Sigues el primer a etiquetar aquest registre!
|