Vertical section construction of wells at Kuyumbinsky oil field via percussive-rotary drilling with DTH hammer
সংরক্ষণ করুন:
Parent link: | IOP Conference Series: Earth and Environmental Science Vol. 43 : Problems of Geology and Subsurface Development.— 2016.— [012072, 7 p.] |
---|---|
প্রধান লেখক: | |
অন্যান্য লেখক: | , |
সংক্ষিপ্ত: | Title screen The article presents the analysis of sequential use of mobile percussive-rotary drilling sets with DTH hammer and bottom-hole cleaning by foam mud in construction of vertical sections along with at Kuyumbinsky oil field. On the basis of the analysis, an engineering solution is proposed to prevent disastrous mud loss that is the key factor of efficiency in implementation of resource-saving technologies. |
ভাষা: | ইংরেজি |
প্রকাশিত: |
2016
|
মালা: | Latest Technologies in Oil and Gas Driling |
বিষয়গুলি: | |
অনলাইন ব্যবহার করুন: | http://dx.doi.org/10.1088/1755-1315/43/1/012072 http://earchive.tpu.ru/handle/11683/35181 |
বিন্যাস: | বৈদ্যুতিক গ্রন্থের অধ্যায় |
KOHA link: | https://koha.lib.tpu.ru/cgi-bin/koha/opac-detail.pl?biblionumber=650896 |
ট্যাগগুলো: |
ট্যাগ যুক্ত করুন
কোনো ট্যাগ নেই, প্রথমজন হিসাবে ট্যাগ করুন!
|