The diagram development for Computer Added Control and Monitoring system of drilling; IOP Conference Series: Earth and Environmental Science; Vol. 27 : Problems of Geology and Subsurface Development

書誌詳細
Parent link:IOP Conference Series: Earth and Environmental Science
Vol. 27 : Problems of Geology and Subsurface Development.— 2015.— [012050, 6 p.]
共著者: Национальный исследовательский Томский политехнический университет (ТПУ) Институт природных ресурсов (ИПР) Кафедра иностранных языков (ИЯПР), Национальный исследовательский Томский политехнический университет (ТПУ) Институт природных ресурсов (ИПР) Кафедра бурения скважин (БС)
その他の著者: Epikhin A. V. Anton Vladimirovich, Mikhalev R. S., Anisimov A. V., Ulyanova O. S. Oksana Sergeevna
要約:Title screen
The paper is concerned with the first stage of the extensive research aimed at developing design-automation system and well drilling process control. The proposed system is going to have some advantages over modern analogues, such as economic analysis at all levels, active engineering staff feedback, precedent-related principle for recommendations, etc. It will essentially reduce the risk of human errors and also optimize the well construction process from design to commissioning. The paper considers the results of the first design stage in a form of flow diagrams.
Режим доступа: по договору с организацией-держателем ресурса
言語:英語
出版事項: 2015
シリーズ:Latest Technology of Oil and Gas Driling
主題:
オンライン・アクセス:http://dx.doi.org/10.1088/1755-1315/27/1/012050
http://earchive.tpu.ru/handle/11683/19951
フォーマット: 電子媒体 図書の章
KOHA link:https://koha.lib.tpu.ru/cgi-bin/koha/opac-detail.pl?biblionumber=645137
その他の書誌記述
要約:Title screen
The paper is concerned with the first stage of the extensive research aimed at developing design-automation system and well drilling process control. The proposed system is going to have some advantages over modern analogues, such as economic analysis at all levels, active engineering staff feedback, precedent-related principle for recommendations, etc. It will essentially reduce the risk of human errors and also optimize the well construction process from design to commissioning. The paper considers the results of the first design stage in a form of flow diagrams.
Режим доступа: по договору с организацией-держателем ресурса
DOI:10.1088/1755-1315/27/1/012050