The diagram development for Computer Added Control and Monitoring system of drilling; IOP Conference Series: Earth and Environmental Science; Vol. 27 : Problems of Geology and Subsurface Development

Detaylı Bibliyografya
Parent link:IOP Conference Series: Earth and Environmental Science
Vol. 27 : Problems of Geology and Subsurface Development.— 2015.— [012050, 6 p.]
Kurumsal yazarlar: Национальный исследовательский Томский политехнический университет (ТПУ) Институт природных ресурсов (ИПР) Кафедра иностранных языков (ИЯПР), Национальный исследовательский Томский политехнический университет (ТПУ) Институт природных ресурсов (ИПР) Кафедра бурения скважин (БС)
Diğer Yazarlar: Epikhin A. V. Anton Vladimirovich, Mikhalev R. S., Anisimov A. V., Ulyanova O. S. Oksana Sergeevna
Özet:Title screen
The paper is concerned with the first stage of the extensive research aimed at developing design-automation system and well drilling process control. The proposed system is going to have some advantages over modern analogues, such as economic analysis at all levels, active engineering staff feedback, precedent-related principle for recommendations, etc. It will essentially reduce the risk of human errors and also optimize the well construction process from design to commissioning. The paper considers the results of the first design stage in a form of flow diagrams.
Режим доступа: по договору с организацией-держателем ресурса
Dil:İngilizce
Baskı/Yayın Bilgisi: 2015
Seri Bilgileri:Latest Technology of Oil and Gas Driling
Konular:
Online Erişim:http://dx.doi.org/10.1088/1755-1315/27/1/012050
http://earchive.tpu.ru/handle/11683/19951
Materyal Türü: Elektronik Kitap Bölümü
KOHA link:https://koha.lib.tpu.ru/cgi-bin/koha/opac-detail.pl?biblionumber=645137
Diğer Bilgiler
Özet:Title screen
The paper is concerned with the first stage of the extensive research aimed at developing design-automation system and well drilling process control. The proposed system is going to have some advantages over modern analogues, such as economic analysis at all levels, active engineering staff feedback, precedent-related principle for recommendations, etc. It will essentially reduce the risk of human errors and also optimize the well construction process from design to commissioning. The paper considers the results of the first design stage in a form of flow diagrams.
Режим доступа: по договору с организацией-держателем ресурса
DOI:10.1088/1755-1315/27/1/012050