The diagram development for Computer Added Control and Monitoring system of drilling
| Parent link: | IOP Conference Series: Earth and Environmental Science Vol. 27 : Problems of Geology and Subsurface Development.— 2015.— [012050, 6 p.] |
|---|---|
| مؤلفون مشاركون: | , |
| مؤلفون آخرون: | , , , |
| الملخص: | Title screen The paper is concerned with the first stage of the extensive research aimed at developing design-automation system and well drilling process control. The proposed system is going to have some advantages over modern analogues, such as economic analysis at all levels, active engineering staff feedback, precedent-related principle for recommendations, etc. It will essentially reduce the risk of human errors and also optimize the well construction process from design to commissioning. The paper considers the results of the first design stage in a form of flow diagrams. Режим доступа: по договору с организацией-держателем ресурса |
| اللغة: | الإنجليزية |
| منشور في: |
2015
|
| سلاسل: | Latest Technology of Oil and Gas Driling |
| الموضوعات: | |
| الوصول للمادة أونلاين: | http://dx.doi.org/10.1088/1755-1315/27/1/012050 http://earchive.tpu.ru/handle/11683/19951 |
| التنسيق: | الكتروني فصل الكتاب |
| KOHA link: | https://koha.lib.tpu.ru/cgi-bin/koha/opac-detail.pl?biblionumber=645137 |