Complex analysis of planning the power station equipment repair in generating companies
| Parent link: | Bulletin of the Tomsk Polytechnic University/ Tomsk Polytechnic University (TPU).— , 2006-2007 Vol. 311, № 4 : Power engineering.— 2007.— [P. 134-138] |
|---|---|
| Other Authors: | , , , |
| Summary: | Заглавие с титульного листа Электронная версия печатной публикации The problem of planning the thermal power station equipment repair in conditions of transition to adjustable markets of energy has been analyzed. The bases of applying the system approach in conditions of real restrictions by financial resources are stated. The method based on classification of sources of repair work initiation and considering priorities of works for different control levels is offered as a scheduling algorithm. |
| Published: |
2007
|
| Series: | Power engineering |
| Subjects: | |
| Online Access: | http://www.lib.tpu.ru/fulltext/v/Bulletin_TPU/2007/v311eng/i4/32.pdf |
| Format: | Electronic Book Chapter |
| KOHA link: | https://koha.lib.tpu.ru/cgi-bin/koha/opac-detail.pl?biblionumber=194417 |