Complex analysis of planning the power station equipment repair in generating companies

Bibliographic Details
Parent link:Bulletin of the Tomsk Polytechnic University/ Tomsk Polytechnic University (TPU).— , 2006-2007
Vol. 311, № 4 : Power engineering.— 2007.— [P. 134-138]
Other Authors: Belyaev L. A., Zavorin A. S. Aleksandr Sergeevich, Kosyakov S. A., Krivoguzov K. A.
Summary:Заглавие с титульного листа
Электронная версия печатной публикации
The problem of planning the thermal power station equipment repair in conditions of transition to adjustable markets of energy has been analyzed. The bases of applying the system approach in conditions of real restrictions by financial resources are stated. The method based on classification of sources of repair work initiation and considering priorities of works for different control levels is offered as a scheduling algorithm.
Published: 2007
Series:Power engineering
Subjects:
Online Access:http://www.lib.tpu.ru/fulltext/v/Bulletin_TPU/2007/v311eng/i4/32.pdf
Format: Electronic Book Chapter
KOHA link:https://koha.lib.tpu.ru/cgi-bin/koha/opac-detail.pl?biblionumber=194417