Ամփոփում:Title screen
A mechanical support in a longwall complex requires proper supervision and control of operating parameters because it is responsible for the safety of machines and workers. Its main functions are to protect the excavation against the adverse effects of rock mass and to move it along with the operational progress of the shearer and the scraper conveyor. In the era of Industry 4.0 as well as green economy and sustainable development, the development of machines and devices included in the longwall complex is an important area of invention. When it comes to the mechanical support included in the longwall complex, the authors propose changes to the hydraulic control system. The main purpose of the work was to develop a system that can automatically expand the legs of the powered support. Tests were carried out under real conditions while equipping the support section with a prototypical hydraulic system and with a system monitoring the correct operation of the prototype. This article presents the development of a prototypical installation under real conditions for testing on a longwall. The innovative solution proposed by the authors consisted of introducing a prototypical double valve block into the hydraulic system of the housing, which enables the function of automatic section expansion. The authors proposed a solution aimed at shortening the work time of the powered-support-section operator. The research results made it possible to evaluate the usefulness of the proposed solution. This type of solution can be considered technical support in the process of coal mining in an underground mine. Analysis presented in this paper, along with results from research conducted and its conclusions, can be of practical help to enclosure users to improve reliability and achieve optimal performance.
Լեզու:անգլերեն
Հրապարակվել է: 2022
Խորագրեր:
Առցանց հասանելիություն:https://doi.org/10.3390/en15030680
Ձևաչափ: Էլեկտրոնային Գրքի գլուխ
KOHA link:https://koha.lib.tpu.ru/cgi-bin/koha/opac-detail.pl?biblionumber=668796

MARC

LEADER 00000naa0a2200000 4500
001 668796
005 20250220104009.0
035 |a (RuTPU)RU\TPU\network\40033 
035 |a RU\TPU\network\39799 
090 |a 668796 
100 |a 20230125d2022 k||y0rusy50 ba 
101 0 |a eng 
102 |a CH 
135 |a drcn ---uucaa 
181 0 |a i  
182 0 |a b 
200 1 |a Development of a Hydraulic System for the Automatic Expansion of Powered Roof Support  |f D. Szurgacz, B. Borska, R. Diederichs, S. A. Zhironkin 
203 |a Text  |c electronic 
300 |a Title screen 
320 |a [References: 59 tit.] 
330 |a A mechanical support in a longwall complex requires proper supervision and control of operating parameters because it is responsible for the safety of machines and workers. Its main functions are to protect the excavation against the adverse effects of rock mass and to move it along with the operational progress of the shearer and the scraper conveyor. In the era of Industry 4.0 as well as green economy and sustainable development, the development of machines and devices included in the longwall complex is an important area of invention. When it comes to the mechanical support included in the longwall complex, the authors propose changes to the hydraulic control system. The main purpose of the work was to develop a system that can automatically expand the legs of the powered support. Tests were carried out under real conditions while equipping the support section with a prototypical hydraulic system and with a system monitoring the correct operation of the prototype. This article presents the development of a prototypical installation under real conditions for testing on a longwall. The innovative solution proposed by the authors consisted of introducing a prototypical double valve block into the hydraulic system of the housing, which enables the function of automatic section expansion. The authors proposed a solution aimed at shortening the work time of the powered-support-section operator. The research results made it possible to evaluate the usefulness of the proposed solution. This type of solution can be considered technical support in the process of coal mining in an underground mine. Analysis presented in this paper, along with results from research conducted and its conclusions, can be of practical help to enclosure users to improve reliability and achieve optimal performance. 
461 |t Energies 
463 |t Vol. 15, iss. 3  |v [680, 15 p.]  |d 2022 
610 1 |a электронный ресурс 
610 1 |a труды учёных ТПУ 
610 1 |a powered roof support 
610 1 |a hydraulic leg 
610 1 |a hydraulic system 
610 1 |a work automation 
610 1 |a tests under real conditions 
701 1 |a Szurgacz  |b D.  |g Dawid 
701 1 |a Borska  |b B.  |g Beata 
701 1 |a Diederichs  |b R.  |g Ryszard 
701 1 |a Zhironkin  |b S. A.  |c economist  |c Professor of Tomsk Polytechnic University, Doctor of economic science  |f 1975-  |g Sergey Aleksandrovich  |3 (RuTPU)RU\TPU\pers\33531  |9 17198 
712 0 2 |a Национальный исследовательский Томский политехнический университет  |b Школа базовой инженерной подготовки  |b Отделение социально-гуманитарных наук  |3 (RuTPU)RU\TPU\col\23512 
801 0 |a RU  |b 63413507  |c 20230125  |g RCR 
856 4 |u https://doi.org/10.3390/en15030680 
942 |c CF