Standardized Technologies of Condition Monitoring for High Voltage, Chapter 2
| Parent link: | Power Systems: book series Transformer Condition Control.— 2022.— [P. 23-68] |
|---|---|
| 団体著者: | |
| その他の著者: | , , , |
| 要約: | Title screen For monitoring the condition of transformer active parts, there are two main requirements that stand out: detection of defects at an early stage and diagnostics with voltage in operation and transformer bundling intact (“ON-LINE” mode). Режим доступа: по договору с организацией-держателем ресурса |
| 言語: | 英語 |
| 出版事項: |
2022
|
| 主題: | |
| オンライン・アクセス: | https://doi.org/10.1007/978-3-030-83198-1_2 |
| フォーマット: | 電子媒体 図書の章 |
| KOHA link: | https://koha.lib.tpu.ru/cgi-bin/koha/opac-detail.pl?biblionumber=666633 |
| 要約: | Title screen For monitoring the condition of transformer active parts, there are two main requirements that stand out: detection of defects at an early stage and diagnostics with voltage in operation and transformer bundling intact (“ON-LINE” mode). Режим доступа: по договору с организацией-держателем ресурса |
|---|---|
| DOI: | 10.1007/978-3-030-83198-1_2 |