Building of Effective Control and Management System for Injection Horizontal Wells During Waterflooding; SPE Russian Petroleum Technology Conference

Detalles Bibliográficos
Parent link:SPE Russian Petroleum Technology Conference.— 2018.— [6 p.]
Autor Corporativo: Национальный исследовательский Томский политехнический университет Инженерная школа природных ресурсов Отделение нефтегазового дела
Otros Autores: Galeev R. Rail, Rybakov R. Roman, Yakovlev A. A. Andrey Alexandrovich, Kayeshkov I. Ilya, Simakov S. Sergey, Fayzullin I. Ildar, Sagirov A. Aleksandr, Feoktistov R. Roman, Suleymanov A. Ayyar
Sumario:Title screen
The main uncertainties in the field development with the use of multiple-fractured horizontal wells (MFHW) in waterflooding are the inflow/injection profile along the horizontal wellbore, the number of working hydraulic fracturing ports, the dynamics of the productivity factor, the presence of the self-induced fracturing effect. All these factors affect the sweep efficiency and oil recovery factor. To remove uncertainties and increase the efficiency of waterflooding, a systematic approach to the control and management of the MFHW is required. Implementation of this approach is an important direction of technological development of Gazprom Neft PJSC. The creation of a system for monitoring and managing the MFHW is based on the search, sampling, analysis of efficiency and selection of control technologies (geophysical studies for removal of uncertainties) and management technologies (well interventions for improvement of operational efficiency of MFHW). One of the most promising technologies for monitoring the MFHW is long-term monitoring of downhole parameters (temperature and noise) with fiber-optic systems (FOS). Gazprom Neft PJSC has a positive expirience in this area, which includes the use of the FOS of various configurations, design and interpretation of the results of this type of research. Therefore, the main issue of using FOS in MFHW is the delivery of optical fiber to the horizontal part of the well with the possibility of further carrying out the well interventions without dismantling the FOS. The paper describes the results of testing a unique method of delivery of fiber-optic cable in the MFHW using coiled tubing and hydraulic anchor at the field in the Orenburg region.
Режим доступа: по договору с организацией-держателем ресурса
Lenguaje:inglés
Publicado: 2018
Materias:
Acceso en línea:https://doi.org/10.2118/191577-18RPTC-MS
Formato: Electrónico Capítulo de libro
KOHA link:https://koha.lib.tpu.ru/cgi-bin/koha/opac-detail.pl?biblionumber=661572

MARC

LEADER 00000naa0a2200000 4500
001 661572
005 20250829141031.0
035 |a (RuTPU)RU\TPU\network\32212 
035 |a RU\TPU\network\14987 
090 |a 661572 
100 |a 20200115d2018 k y0engy50 ba 
101 0 |a eng 
135 |a drcn ---uucaa 
181 0 |a i  
182 0 |a b 
200 1 |a Building of Effective Control and Management System for Injection Horizontal Wells During Waterflooding  |f R. Galeev [et al.] 
203 |a Text  |c electronic 
300 |a Title screen 
330 |a The main uncertainties in the field development with the use of multiple-fractured horizontal wells (MFHW) in waterflooding are the inflow/injection profile along the horizontal wellbore, the number of working hydraulic fracturing ports, the dynamics of the productivity factor, the presence of the self-induced fracturing effect. All these factors affect the sweep efficiency and oil recovery factor. To remove uncertainties and increase the efficiency of waterflooding, a systematic approach to the control and management of the MFHW is required. Implementation of this approach is an important direction of technological development of Gazprom Neft PJSC. The creation of a system for monitoring and managing the MFHW is based on the search, sampling, analysis of efficiency and selection of control technologies (geophysical studies for removal of uncertainties) and management technologies (well interventions for improvement of operational efficiency of MFHW). One of the most promising technologies for monitoring the MFHW is long-term monitoring of downhole parameters (temperature and noise) with fiber-optic systems (FOS). Gazprom Neft PJSC has a positive expirience in this area, which includes the use of the FOS of various configurations, design and interpretation of the results of this type of research. Therefore, the main issue of using FOS in MFHW is the delivery of optical fiber to the horizontal part of the well with the possibility of further carrying out the well interventions without dismantling the FOS. The paper describes the results of testing a unique method of delivery of fiber-optic cable in the MFHW using coiled tubing and hydraulic anchor at the field in the Orenburg region. 
333 |a Режим доступа: по договору с организацией-держателем ресурса 
463 |t SPE Russian Petroleum Technology Conference  |o 15-17 October 2018, Moscow, Russia  |v [6 p.]  |d 2018 
610 1 |a электронный ресурс 
610 1 |a труды учёных ТПУ 
610 1 |a горизонтальные скважины 
610 1 |a заводнение 
610 1 |a эффективность 
610 1 |a контроль 
610 1 |a закачка 
701 1 |a Galeev  |b R.  |g Rail 
701 1 |a Rybakov  |b R.  |g Roman 
701 1 |a Yakovlev  |b A. A.  |c specialist in the field of petroleum engineering  |c First Vice-Rector, Associate Professor of Tomsk Polytechnic University, Doctor of physical and mathematical sciences  |f 1981-  |g Andrey Alexandrovich  |3 (RuTPU)RU\TPU\pers\45819 
701 1 |a Kayeshkov  |b I.  |g Ilya 
701 1 |a Simakov  |b S.  |g Sergey 
701 1 |a Fayzullin  |b I.  |g Ildar 
701 1 |a Sagirov  |b A.  |g Aleksandr 
701 1 |a Feoktistov  |b R.  |g Roman 
701 1 |a Suleymanov  |b A.  |g Ayyar 
712 0 2 |a Национальный исследовательский Томский политехнический университет  |b Инженерная школа природных ресурсов  |b Отделение нефтегазового дела  |3 (RuTPU)RU\TPU\col\23546 
801 2 |a RU  |b 63413507  |c 20200115  |g RCR 
856 4 |u https://doi.org/10.2118/191577-18RPTC-MS 
942 |c CF