Technology of extended pillar recovery in room and pillar mining in leading coal producing countries. Review; Eurasian Mining; № 1

التفاصيل البيبلوغرافية
Parent link:Eurasian Mining
№ 1.— 2019.— [P. 21-24]
المؤلف الرئيسي: Prokopenko S. A. Sergey Arturovich
مؤلف مشترك: Национальный исследовательский Томский политехнический университет (ТПУ) Юргинский технологический институт (филиал) (ЮТИ) Отделение цифровых технологий (ОЦТ)
مؤلفون آخرون: Sementsov V. V. Vyacheslav Vladimirovich, Dobrovolsky M. S. Maksim Sergeevich
الملخص:Title screen
The room and pillar method (RPM) of coal extraction is used by Russian mines in areas unsuitable for longwalling while foreign mines apply it as the dominant technology at high cost–performance ratio. Evaluation of potential expansion of application domain for RPM in Russia needs in-depth study of foreign high-efficiency coal mining technologies. This article reviews process flow charts of coal extraction from pillars in the room and pillar mining technology in the USA, Australia, South Africa, etc. The technological advance is based mobile roof support applied since 1970 for ground control and to ensure safety of people and equipment. The structure and implementation variants of the support are discussed. There are two groups of the pillar recovery technologies with mobile roof support. The groups differ by conditions, parameters and sequence of mining operations. The first group includes variants of coal extraction from extended pillars between long rooms. The flow charts of one-side and two-side pillar recovery with different sets of MRS are discussed. The sequence of cutting entries in pillars, advancing the support and leaving support segments in the pillars are described. The second group of the process flow charts concerns square rib pillars. Such pillars left with initial parameters in mines resulted in high coal loss, and variants of partial coal extraction have been found therefore. Square pillars are recovered with mobile roof supports subsequently from four sides.
The roof support is ensured by three MRS. The entries in the pillars are cut by the Christmas tree method, which shortens ferry time of cutter-loaders and improves coal production output. In hazardous conditions, pillars are cut by entries made along two sides. Diagonal entries can be used as well. Design and application of the advanced equipment for RPM has offered diverse technologies possibilities to miners in different countries to carry out safe extraction of coal from pillars and to increase the rate of of coal pillar recovery to 90 % and higher.
منشور في: 2019
الموضوعات:
الوصول للمادة أونلاين:http://dx.doi.org/10.17580/em.2019.01.05
التنسيق: MixedMaterials الكتروني فصل الكتاب
KOHA link:https://koha.lib.tpu.ru/cgi-bin/koha/opac-detail.pl?biblionumber=661356

MARC

LEADER 00000naa0a2200000 4500
001 661356
005 20250415134643.0
035 |a (RuTPU)RU\TPU\network\31699 
035 |a RU\TPU\network\28804 
090 |a 661356 
100 |a 20191203d2019 k||y0rusy50 ba 
102 |a RU 
135 |a drcn ---uucaa 
181 0 |a i  
182 0 |a b 
200 1 |a Technology of extended pillar recovery in room and pillar mining in leading coal producing countries. Review  |f S. A. Prokopenko, V. V. Sementsov, M. S. Dobrovolsky 
203 |a Текст  |c электронный 
300 |a Title screen 
320 |a [References: 28 tit.] 
330 |a The room and pillar method (RPM) of coal extraction is used by Russian mines in areas unsuitable for longwalling while foreign mines apply it as the dominant technology at high cost–performance ratio. Evaluation of potential expansion of application domain for RPM in Russia needs in-depth study of foreign high-efficiency coal mining technologies. This article reviews process flow charts of coal extraction from pillars in the room and pillar mining technology in the USA, Australia, South Africa, etc. The technological advance is based mobile roof support applied since 1970 for ground control and to ensure safety of people and equipment. The structure and implementation variants of the support are discussed. There are two groups of the pillar recovery technologies with mobile roof support. The groups differ by conditions, parameters and sequence of mining operations. The first group includes variants of coal extraction from extended pillars between long rooms. The flow charts of one-side and two-side pillar recovery with different sets of MRS are discussed. The sequence of cutting entries in pillars, advancing the support and leaving support segments in the pillars are described. The second group of the process flow charts concerns square rib pillars. Such pillars left with initial parameters in mines resulted in high coal loss, and variants of partial coal extraction have been found therefore. Square pillars are recovered with mobile roof supports subsequently from four sides. 
330 |a The roof support is ensured by three MRS. The entries in the pillars are cut by the Christmas tree method, which shortens ferry time of cutter-loaders and improves coal production output. In hazardous conditions, pillars are cut by entries made along two sides. Diagonal entries can be used as well. Design and application of the advanced equipment for RPM has offered diverse technologies possibilities to miners in different countries to carry out safe extraction of coal from pillars and to increase the rate of of coal pillar recovery to 90 % and higher. 
461 |t Eurasian Mining 
463 |t № 1  |v [P. 21-24]  |d 2019 
610 1 |a электронный ресурс 
610 1 |a труды учёных ТПУ 
610 1 |a mine 
610 1 |a coal 
610 1 |a room 
610 1 |a mining 
610 1 |a panel 
610 1 |a pillar 
610 1 |a roof 
610 1 |a technology 
610 1 |a mobile roof support 
610 1 |a extraction 
610 1 |a reserves 
610 1 |a шахты 
610 1 |a уголь 
610 1 |a рудники 
610 1 |a панели 
610 1 |a столбы 
610 1 |a крыши 
610 1 |a добыча 
610 1 |a запасы 
700 1 |a Prokopenko  |b S. A.  |c mining engineer, economist  |c Professor of Tomsk Polytechnic University and Yurga technological Institute of Tomsk Polytechnic University, Doctor of technical sciences  |f 1959-  |g Sergey Arturovich  |3 (RuTPU)RU\TPU\pers\34648 
701 1 |a Sementsov  |b V. V.  |g Vyacheslav Vladimirovich 
701 1 |a Dobrovolsky  |b M. S.  |g Maksim Sergeevich 
712 0 2 |a Национальный исследовательский Томский политехнический университет (ТПУ)  |b Юргинский технологический институт (филиал) (ЮТИ)  |b Отделение цифровых технологий (ОЦТ)  |3 (RuTPU)RU\TPU\col\24718 
801 2 |a RU  |b 63413507  |c 20191203  |g RCR 
850 |a 63413507 
856 4 |u http://dx.doi.org/10.17580/em.2019.01.05 
942 |c CF