Integral analysis of geological and field data for selection of oilfield development strategy
| Parent link: | IOP Conference Series: Earth and Environmental Science Vol. 43 : Problems of Geology and Subsurface Development.— 2016.— [012057, 4 p.] |
|---|---|
| Príomhchruthaitheoir: | |
| Údar corparáideach: | |
| Rannpháirtithe: | |
| Achoimre: | Title screen The reservoir development plan is a complex process and should be analysed from different points of view. The process was analysed in terms of geology, petrophysics, modelling, production technology and economics. Therefore, different methods should be used for the project. |
| Teanga: | Béarla |
| Foilsithe / Cruthaithe: |
2016
|
| Sraith: | Latest Research in Reservoir Engineering |
| Ábhair: | |
| Rochtain ar líne: | http://dx.doi.org/10.1088/1755-1315/43/1/012057 http://earchive.tpu.ru/handle/11683/35166 |
| Formáid: | Leictreonach Caibidil leabhair |
| KOHA link: | https://koha.lib.tpu.ru/cgi-bin/koha/opac-detail.pl?biblionumber=650874 |
| Achoimre: | Title screen The reservoir development plan is a complex process and should be analysed from different points of view. The process was analysed in terms of geology, petrophysics, modelling, production technology and economics. Therefore, different methods should be used for the project. |
|---|---|
| DOI: | 10.1088/1755-1315/43/1/012057 |