Operation modes of a hydro-generator as a part of the inverter micro hydropower plant; IOP Conference Series: Materials Science and Engineering; Vol. 124 : Mechanical Engineering, Automation and Control Systems (MEACS2015)

書誌詳細
Parent link:IOP Conference Series: Materials Science and Engineering
Vol. 124 : Mechanical Engineering, Automation and Control Systems (MEACS2015).— 2016.— [012070, 6 p.]
団体著者: Национальный исследовательский Томский политехнический университет
その他の著者: Lukutin B. V. Boris Vladimirovich, Shandarova E. B. Elena Borisovna, Matukhin D. L. Dmitriy Leonidovich, Makarova A. F., Fuks I. L.
要約:Title screen
The paper dwells on the selection problem of power equipment for a stand-alone inverter micro hydropower plant, in particular a hydro-generator, and evaluation of its operation modes. Numerical experiments included the modes calculation of hydroelectric units of the same type with various nominal power, supplied to the consumer according to the unchanged electric load curve. The studies developed requirements for a hydro-turbine and a synchronous generator in terms of a speed range and installed capacity, depending on the load curve. The possibility of using general industrial hydroelectric units with nominal power equal to half-maximum capacity of a typical daily load curve in rural areas was shown.
言語:英語
出版事項: 2016
シリーズ:Numerical Simulation of Applied Problems
主題:
オンライン・アクセス:http://dx.doi.org/10.1088/1757-899X/124/1/012070
http://earchive.tpu.ru/handle/11683/33855
フォーマット: 電子媒体 図書の章
KOHA link:https://koha.lib.tpu.ru/cgi-bin/koha/opac-detail.pl?biblionumber=648540
その他の書誌記述
要約:Title screen
The paper dwells on the selection problem of power equipment for a stand-alone inverter micro hydropower plant, in particular a hydro-generator, and evaluation of its operation modes. Numerical experiments included the modes calculation of hydroelectric units of the same type with various nominal power, supplied to the consumer according to the unchanged electric load curve. The studies developed requirements for a hydro-turbine and a synchronous generator in terms of a speed range and installed capacity, depending on the load curve. The possibility of using general industrial hydroelectric units with nominal power equal to half-maximum capacity of a typical daily load curve in rural areas was shown.
DOI:10.1088/1757-899X/124/1/012070