Associated petroleum gas utilization in Tomsk Oblast:energy efficiency and tax advantages; IOP Conference Series: Earth and Environmental Science; Vol. 27 : Problems of Geology and Subsurface Development

Bibliographische Detailangaben
Parent link:IOP Conference Series: Earth and Environmental Science
Vol. 27 : Problems of Geology and Subsurface Development.— 2015.— [012078, 5 p.]
Körperschaften: Национальный исследовательский Томский политехнический университет (ТПУ) Институт природных ресурсов (ИПР) Кафедра иностранных языков (ИЯПР), Национальный исследовательский Томский политехнический университет (ТПУ) Институт природных ресурсов (ИПР) Кафедра экономики природных ресурсов (ЭПР)
Weitere Verfasser: Vazim A. A. Andrey Aleksandrovich, Romanyuk V. B. Vera Borisovna, Ahmadeev K., Matveenko I. A. Irina Alekseevna
Zusammenfassung:Title screen
This article deals with oil production companies activities in increasing the utilization volume of associated petroleum gas (APG) in Tomsk Oblast. Cost-effectiveness analysis of associated petroleum gas utilization was carried out using the example of gas engine power station AGP-350 implementation at Yuzhno-Cheremshanskoye field, Tomsk Oblast. Authors calculated the effectiveness taking into account the tax advantages of 2012. The implementation of this facility shows high profitability, the payback period being less than 2 years.
Режим доступа: по договору с организацией-держателем ресурса
Sprache:Englisch
Veröffentlicht: 2015
Schriftenreihe:Petroleum Engineering Economics. Mining Law
Schlagworte:
Online-Zugang:http://dx.doi.org/10.1088/1755-1315/27/1/012078
http://earchive.tpu.ru/handle/11683/19980
Format: Elektronisch Buchkapitel
KOHA link:https://koha.lib.tpu.ru/cgi-bin/koha/opac-detail.pl?biblionumber=645180
Beschreibung
Zusammenfassung:Title screen
This article deals with oil production companies activities in increasing the utilization volume of associated petroleum gas (APG) in Tomsk Oblast. Cost-effectiveness analysis of associated petroleum gas utilization was carried out using the example of gas engine power station AGP-350 implementation at Yuzhno-Cheremshanskoye field, Tomsk Oblast. Authors calculated the effectiveness taking into account the tax advantages of 2012. The implementation of this facility shows high profitability, the payback period being less than 2 years.
Режим доступа: по договору с организацией-держателем ресурса
DOI:10.1088/1755-1315/27/1/012078