Designing economic and legal mechanism of land management in oil and gas companies
| Parent link: | IOP Conference Series: Earth and Environmental Science Vol. 24 : Scientific and Technical Challenges in the Well Drilling Progress, 24–27 November 2014, Tomsk, Russia.— 2015.— [012032, 5 p.] |
|---|---|
| Հիմնական հեղինակ: | |
| Համատեղ հեղինակներ: | , |
| Այլ հեղինակներ: | , |
| Ամփոփում: | Title screen The article deals with the problem of economic and legal relationship in the sphere of land management provided by Russian government. The gas pipeline construction serves as an example to analyze the problems connected with leasing of both federal and privately owned lands. Comparative analysis of costs made by Gazprom to lease the lands at the stage of construction has been conducted. It has been concluded that the government should regulate relationships within the land sector to harmonize the interests of the Federation and private landowners. Режим доступа: по договору с организацией-держателем ресурса |
| Լեզու: | անգլերեն |
| Հրապարակվել է: |
2015
|
| Խորագրեր: | |
| Առցանց հասանելիություն: | http://dx.doi.org/10.1088/1755-1315/24/1/012032 |
| Ձևաչափ: | Էլեկտրոնային Գրքի գլուխ |
| KOHA link: | https://koha.lib.tpu.ru/cgi-bin/koha/opac-detail.pl?biblionumber=639728 |
| Ամփոփում: | Title screen The article deals with the problem of economic and legal relationship in the sphere of land management provided by Russian government. The gas pipeline construction serves as an example to analyze the problems connected with leasing of both federal and privately owned lands. Comparative analysis of costs made by Gazprom to lease the lands at the stage of construction has been conducted. It has been concluded that the government should regulate relationships within the land sector to harmonize the interests of the Federation and private landowners. Режим доступа: по договору с организацией-держателем ресурса |
|---|---|
| DOI: | 10.1088/1755-1315/24/1/012032 |