Analysis of heat-cogeneration turbine unit operation in schemes of preliminary treatment of makeup water; Bulletin of the Tomsk Polytechnic University; Vol. 311, № 4 : Power engineering

Bibliographische Detailangaben
Parent link:Bulletin of the Tomsk Polytechnic University/ Tomsk Polytechnic University (TPU).— , 2006-2007
Vol. 311, № 4 : Power engineering.— 2007.— [P. 53-56]
1. Verfasser: Zalomikhin V. A.
Weitere Verfasser: Kalugin B. F.
Zusammenfassung:Заглавие с титульного листа
Электронная версия печатной публикации
The new scheme of preliminary treatment of makeup water of various technological purposes at parallel work of turbine units with heat release to external consumers has been offered. Variants of work of one of the existing and offered schemes are compared and analyzed. Use of the developed scheme in comparison with the existing one allows cutting fuel consumption up to 15...16 % or 31 thousand tons of equivalent fuel per heating season.
Sprache:Englisch
Veröffentlicht: 2007
Schriftenreihe:Power engineering
Schlagworte:
Online-Zugang:http://www.lib.tpu.ru/fulltext/v/Bulletin_TPU/2007/v311eng/i4/11.pdf
Format: Elektronisch Buchkapitel
KOHA link:https://koha.lib.tpu.ru/cgi-bin/koha/opac-detail.pl?biblionumber=194275
Beschreibung
Beschreibung:1 файл (391 Кб)
Zusammenfassung:Заглавие с титульного листа
Электронная версия печатной публикации
The new scheme of preliminary treatment of makeup water of various technological purposes at parallel work of turbine units with heat release to external consumers has been offered. Variants of work of one of the existing and offered schemes are compared and analyzed. Use of the developed scheme in comparison with the existing one allows cutting fuel consumption up to 15...16 % or 31 thousand tons of equivalent fuel per heating season.